WCSD MASTER PLAN REFERENDUM

WCSD MASTER PLAN REFERENDUM
QUESTIONS AND ANSWERS

What is meant by the terms Master Plan and Five Year Plan?
Master Plan:
Since August 2003 the District has, through the efforts of staff, community 
volunteers, board members and professional consultants, worked diligently to 
develop a long-range vision. This vision addresses projected student 
enrollments, facilities, class sizes, grade alignment, feeder patterns, 
educational programs and services, a middle-level education model, and full-
day kindergarten. This planned vision is known as the District’s Master Plan.

Five-Year Plan:
The District’s Five-Year Plan identifies and prioritizes projects of a 
capital construction nature such as roof replacements, paving, and heating 
and ventilating system upgrades, and schedules this work over the course of 
a five-year period. The plan document is updated annually. To date, this 
work has been funded via the District’s annual budget and periodic 
referendums.

Does the work being proposed satisfy all of the goals identified in the 
District’s Master Plan?
The proposition directly addresses four of the six Master Plan goals by 
providing: 
Consistent grade level configurations (K-5, 6-8, 9-12)
Creating a clear attendance path (feeder patterns) among schools as students 
move from kindergarten through high school
Implementing the middle school education model at both Van Wyck and 
Wappingers Junior High Schools
Placing special education intervention services into each elementary school
The proposition partially addresses Master Plan class size guidelines but 
does not address full-day kindergarten. These goals may be addressed in 
greater detail in the near future. 
Although not included as Master Plan goals, yet to be addressed is the need 
for a transportation facility, as well as permanent locations for the 
District’s alternative high school and administrative offices, and 
improvements to the District’s athletic fields and facilities.

How does the vision of the Master Plan equate to the need for additional 
instructional space in our existing buildings?
Instructional space needs to be developed in our existing buildings for both 
programmatic and logistical reasons. The vision is to have ten K-5 schools, 
two middle schools (grades 6-8), two high schools, and one alternative high 
school, with improved class sizes, consistency in programs, stable feeder 
patterns, and special education services available in every building. It is 
impossible to merge all of the District’s sixth grade students into our 
current junior high schools without planned renovations and additions. 
Additional instructional spaces are also needed to keep elementary class 
sizes from possibly increasing to 30 or more students should future 
enrollments increase as a result of the housing start potential that exists, 
particularly in the southern portion of the District.

The proposed proposition seeks authority to spend up to $107,137,282. How 
will these funds be spent?
Of the total funding authorization being sought, it is estimated that a 
maximum of $88,447,752 would be used to renovate and expand our two junior 
high schools as we look to adopt a consistent middle school program that 
would accommodate maximum enrollments of 1,600 students per school in a 6-8 
grade-level configuration. As a result of eliminating sixth grade centers, 
feeder patterns could be established to insure that families will know in 
advance the planned K-5, 6-8 and 9-12 schools of attendance in a student’s K-
12 career. 
The balance of the expenditure authorization, up to an estimated maximum of 
$18,689,530, would be used to address prioritized capital construction 
projects at each of twelve other District schools as contained in the 
District’s Five-Year Plan.

What portion of the total cost is state aidable and how will the receipt of 
aid be scheduled?
Under the current state building aid formula, the District should be 
entitled to receive aid on 58.3% of approved project costs. Approved project 
costs usually range from between 95% - 100% of total actual costs. The 
middle school additions and renovations scheduled as part of the scope of 
the Master Plan work will be aided over a period of 20 years. The district-
wide reconstruction projects included as part of the District’s Five-Year 
Plan will be aided over a period of 15 years. Of the total $107,137,282 
maximum authorization being sought, it is estimated that approximately $58 
million will be returned to the District in the form of aid.

What will be the impact on my school tax bill?
The borrowings associated with the projects will be phased in over the life 
of the projects. The first payment that will have an impact on the tax levy 
is expected to occur in the 2009-2010 school year. Debt service payments 
will be partially offset by the retirement of current debt. 
The average household, assessed at $350,000, is expected to see an estimated 
annual increase of approximately $74 when the project is fully completed. 

On what basis were Five-Year Plan projects selected to be part of the 
proposition and what types of projects have been included?
The District’s Five-Year Plan is updated annually. Projects are identified, 
prioritized and scheduled for completion during a five-year period with 
respect to health and safety issues and program needs. Projects included 
within the proposition represent categories of work that had been scheduled 
for completion in what would have been years one through three of the Five-
Year Plan. Barring extraordinary or unforeseen circumstances, all of these 
projects will be completed by September 2012. 
Some of the types of projects include roof resurfacing, municipal water and 
sewer hookups, boiler replacements, bathroom renovations and heating and 
ventilating upgrades. A complete list of projects by building is included in 
the Master Plan edition of WCSD In Print or you may consult the District’s 
web site (www.wappingersschool.org).

Are artificial turf athletic fields included in this referendum?
No. However, turf fields are currently being researched for a possible 
future referendum.

Years ago the District experienced comparable enrollments. Why is there a 
need now for more space?
Federal laws passed since the 1970’s require districts to provide special 
education services to disabled students in settings such as resource rooms 
and self-contained classes, and related services including adaptive physical 
education, physical and occupational therapy, speech, social work, school 
psychologists, and testing accommodations. All of these require additional 
classroom, office and therapy space. 
No Child Left Behind (NCLB) legislation now mandates Academic Intervention 
Services (AIS), which include counseling, occupational and physical therapy, 
and speech, as well as support with academic subjects.
In the past, only art, music, library, and physical education were offered 
to elementary students. Today we also offer enrichment and computer classes.
Federal laws now mandate English as a Second Language (ESL) services for an 
increasing number of identified students within the District. 
It was not uncommon to have class sizes of 30 or more students in the past. 
Now, the Board of Education goals seek to reduce the number of students in 
each class to 20 in kindergarten, 22 in grades 1 and 2, and 25 in grades 3-
5. The middle school additions may also enable the District to reduce class 
sizes in the secondary schools as well. 
When WCSD population was at its highest, several grade levels were on split 
sessions.
In the past there was often no dedicated space for art and music programs. 
Art was provided on carts and music was taught on the stage. 
Over the last 20 years New York State has increased the number and types of 
courses students must take at the junior high and high school levels. The 
number of credits required to graduate has grown significantly in the last 
five years.
Years ago schools did not have even one computer classroom. Today, students 
enjoy access to computer classrooms which help prepare them to live and work 
in a technology age.

What physical changes will occur in each of the junior high schools?
Van Wyck will gain approximately 43,000 square feet. This additional space 
will accommodate a gym, cafeteria, computer classroom, two large 
group/ensemble rooms, technology rooms, two small group instruction rooms, a 
new library/media center and a net gain of 15 new classrooms after the 
removal of the modular classrooms. Existing space will be redesigned to 
create another Family and Consumer Science room and special education 
classrooms. Grade levels will be grouped in their own area of the building. 
The baseball field will be relocated and improved. 
Wappingers Junior High will gain approximately 82,750 square feet to be used 
for a large cafeteria on the first floor, four small group instruction 
rooms, a computer classroom, a technology room, a large gym, and 44 new 
classrooms. The proposed addition will preserve the unique architectural 
style of the building while adding needed space. The re-design includes one 
new field for sports activities.

I keep hearing the term “Middle School Model”. Aside from a 6-8 grade level 
configuration, how does this model differ from a junior high school program?
Junior high schools operate with students moving from period to period with 
no “connection” to the teachers or to the subject they are studying. 
The “Middle School Model” recognizes that the years between the ages of 11-
14 (grades 6-8) are a critical time for shaping the direction that a student 
will take in life. Teachers are trained in how to motivate the adolescent 
learner. They work with each other as teams to provide interesting and 
meaningful lessons that help students connect school with the “real” world. 
Students are given the opportunity to explore and develop their interests 
and abilities outside the classroom in a safe, supportive environment. 
Discipline is used to teach students how to make better choices. The “Middle 
School Model” welcomes and encourages parental partnership in education. We 
will be able to fully implement a middle school approach in the District 
once both schools include grades 6-8.

What will happen when 6th grade classes are moved out of the elementary 
schools? Will redistricting be necessary?
It is our goal to make sure each elementary school has enough space for its 
own special education classes, therapist rooms, conference rooms, computer 
classrooms and small group instruction rooms in addition to the needed K-5 
classrooms. In order to do this, some schools will lose one or two 
classrooms while schools with 6th grade centers will gain classrooms. 
Because of this we will need to redistrict in order to make sure no school 
is overcrowded or under-populated and to target class sizes of 20-25 in each 
school. Redistricting will take place once both middle school additions and 
renovations are complete.

What will some of the advantages be for the District’s special education 
programs?
Historically, due to space limitations, special education students have had 
to leave their home school and, in some cases, have been transferred within 
the District as many as three times during their elementary school careers 
in order to receive mandated special education services. Under the 
proposition, special education students will receive services in their home 
school. Every elementary school will have integrated (inclusion), self 
contained and resource room settings for all grade levels. Communication 
classes (K-2, 3-5) will remain a district wide program housed at Myers 
Corners Elementary School.
The plan also provides dedicated office and therapy space in each school for 
our school psychologists, social workers, and speech, occupational and 
physical therapists.

Other than the annual debt service cost that will need to be budgeted for 
the actual construction and renovations, what other types of costs will need 
to be budgeted in future years?
To implement the Master Plan goals there will be a need to add the following 
staff as construction is completed:
Nine elementary teachers 
Five special education teachers
One teacher each for art, music and physical education
One teaching assistant 
Five school monitors
Assistant principal 
Nurse
One full-time and two part-time office positions 
Four night custodians
One-half maintenance mechanic
Estimated initial staffing cost increases with benefits: $2,079,235
Estimated initial utility cost increases: $180,000
Estimated initial equipment and supply cost increases: $24,000

How will any increased traffic flow be accommodated under the planned 
expansions at the new Wappingers Middle School?
Two new parking lot areas with approximately 232 spaces for staff are 
planned, along with a third parking area containing 70 new spaces for 
visitors. Also included are 18 new bus loading spaces. 
The installation of a traffic signal is planned for the intersection of 
Major McDonald Way and Middlebush Road along with improved striping to 
provide a shared “thru/left” and an exclusive right turn lane from the 
school.

What will be the proposed construction timeline?
We expect that the renovations and additions to the new Van Wyck Middle 
School will be finished by September 2011 and that all 6th grade classes 
from Fishkill, Brinckerhoff, Gayhead, and Fishkill Plains will be moved 
accordingly. 
The renovations and additions to the new Wappingers Middle School should be 
completed by September 2012, housing all 6th grade classes from Evans, 
Sheafe Road, Vassar Road, Kinry Road, Oak Grove and Myers Corners.

Since the funding authorization being sought represents the costs for Master 
Plan and Five-Year Plan projects, why aren’t two separate propositions being 
presented?
Separately, neither proposition will meet the planned needs of the District. 
There is $14.2 million in renovation work that must be done in the middle 
schools such as boilers, ceiling tiles, bathroom renovations, and municipal 
water and sewer hookups. By combining the work we would be able to realize 
economies of scale and efficiencies as a result of structured bid packages 
and the scheduling of work.

Possible scenarios if we were to split the proposition:
1. If middle school infrastructure work is in the Five-Year Plan and:
Five-Year Plan passes and Master Plan additions do not pass: We will have 
infrastructure support for an addition that can’t be built per the District 
needs. Note: the cost for this Five-Year Plan would then have to be $14.2 
million higher than what you will see in the current proposition because the 
middle school items would have to be put back into it.
Master Plan additions pass but Five-Year Plan does not pass: We will have 
additions to the middle schools but no infrastructure support for these or 
any other buildings. 
2. If middle school infrastructure work is included in the Master Plan and:
Five-Year Plan passes and additions do not pass: Inequity - The middle 
schools would have no additions or renovations but the other schools in the 
District would have what they need. 
Master Plan additions pass but Five-Year Plan does not pass: Inequity - 
Additions and renovations would be completed at the middle schools but there 
would be no funding for any of the needed renovations in the other twelve 
schools.

 